 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑 $ a7 f% c# w3 g3 V! }) Z, t, j
- `/ R# P4 W6 Q8 w& K+ H" O: m# ]Journeyman Electrician7 @$ x% W8 w/ p9 K, h( D& E0 e5 `
Total Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-2( r: U! d0 \; m
Contractor: Norcan Electric
% v% |7 L+ y+ t, U# J1 C' CLocation: Syncrude Maintenace (Base Plant)
0 b( z% q5 m, L A4 i% G% i- GDescription:& d- G# x% N" k9 p9 b
Day shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.
1 g4 u9 v8 Z5 TPre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.! h5 B' Y% j$ U. M- P! l* S
Open Date: 07/22/2015
* b% P8 J% g9 TClose Date: 08/31/2015- M T) M$ w4 [; l
Job #: 441 |
|