米乐 发表于 2014-6-24 22:12 $ \5 R8 q) ?# @* x, X7 o
一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
, [$ c5 B1 z) m) I: i, YDid you ever follow up with the builder?: p+ k: h9 f: K, h
I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
- ~ ~7 S5 L5 b9 O( ]It is too late to talk about this now.
5 i0 R' {7 n: n M9 PIf you have everything documented, show it to the lawyer and ask for hold back.& L, J9 E+ V! E
9 N5 g; ]& a( I2 {" w( UIf you can live with the wall, ask the builder to compensate you instead of removing the wall.
: a9 m# |- v# ]# j1 O8 ~It will be messy after you move in and they come back to take down the wall. |
|