一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
4 A* e7 S8 b5 h5 Y
Did you ever follow up with the builder? 8 B' `/ N' m8 c: G- e, {I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.2 `' ^: g2 i* v9 F+ m" o1 ?3 t& p
It is too late to talk about this now. ) V5 S6 ] G; XIf you have everything documented, show it to the lawyer and ask for hold back.- a* |2 p+ d6 r: M( o: X% X
9 U* \9 b) L$ `9 P4 rIf you can live with the wall, ask the builder to compensate you instead of removing the wall. 8 ?: A( U1 r0 A+ nIt will be messy after you move in and they come back to take down the wall.