A 6.5 inch dia shaft is to be machined on a TURNING CTR to 4.5 inch dia in 4 equal cuts. If CONSTANT CS is selected calculate the RPM at the beginning of each cut. : F8 G2 W0 N% gNOTE: CS=1000 ft/min for carbide insert used.( ^3 d% b K+ h0 V$ d
8 }; G. R2 S) W
so RPM(1)= 6 J; _; v# J4 ^+ M6 C* X
RPM(2)=# s$ s' h9 M$ A0 z- d
RPM(3)= 6 O: S. @6 b; \1 \, o RPM(4)= ) V( @; q2 u5 l8 E( F! p* e$ N7 v6 E9 A/ S2 F
谢谢指教。