Procedures for building Garage
1.Concrete Foundation:' m; E% _ t5 D% ?. `: B, V
a.land Flating: Need roller and pressor and get earth compaction index to civil technical requirement1 Y$ u! C2 M. N6 t- J# s
b.Footings: need about 16"x8"footing reinforced with 3-15M steel Rebar continuously and 15M transverse rebar at 12" spacing
; y' F+ K1 w( I" C: |c. Concrete wall: about 8" wide by 36" heigh reinfored with 15M vertical rebar at 12" spacing and 3-15M horizontal rebar
/ y+ p% N7 L) }3 u; ]3 v" Od. Slab: about 5"-6" slab reinforced with 10M rebar at 12" spacing each way3 z; I" w5 e& p* s8 b2 C
e. order concrete mix from Lafarge or Inland concrete ready mix
# c! j7 K- R4 s! yf.pour concrete first footing, wall and last slab.
2 }2 p% _3 F- |3 ~# S
8 G3 O5 h" k. a! C+ WAfter 3days later (better 7days) you can start framing with wood and dry wall, and insulatin materials
, f" M& v/ s- Y9 q C, t8 V. V* B/ H, N3 S# l
All of them you need have roughly design and sketch. Estimate materials. |
|