 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑 ' T3 f- i# E! |" g0 N, q+ e& A) A
8 O4 E% t3 I0 F, @Journeyman Electrician7 N7 n; k1 y/ P+ M9 ]3 w
Total Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-2, s4 M) f4 g* r7 j$ y; p- ~5 f9 [
Contractor: Norcan Electric; h, J6 g0 y# `2 e
Location: Syncrude Maintenace (Base Plant)! O+ l, r4 Q2 B v1 `
Description:+ E) i6 [" F, M
Day shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.
( Q* O. l' `0 n: s: LPre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.
. P+ z0 @0 n( zOpen Date: 07/22/2015: k, u1 o- H; i. x' x- V. e5 E
Close Date: 08/31/2015
& J: @# b3 i, C0 L1 cJob #: 441 |
|