一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ... 1 d; q" P. @3 @/ q# W, c, s
Did you ever follow up with the builder?
[4 [8 b- t- n6 YI would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
( V* L" j* @& Z: ?1 CIt is too late to talk about this now. . l/ ?9 w; |% h+ j
If you have everything documented, show it to the lawyer and ask for hold back., s, g4 ?# ^) {5 C( J) C
0 S) X: P/ I6 a8 m: |# O( E
If you can live with the wall, ask the builder to compensate you instead of removing the wall.; Q/ T1 O6 H$ W' m$ m
It will be messy after you move in and they come back to take down the wall. |
|