0 O9 y; V% b2 H! q足球看完了来看看题目。
9 @. p! ]6 c' Z+ @8 T- ?: v6 b: T& {: F- K7 x
The length of the heat trace is 22 meters. The size of the heat trace is 5/16 inch (WATTS/ m SUPPLIIED is 43.7), h. H2 l- O& ?2 m/ l
The drawing is shown as figure 1. (All data is from the memory. They are not the same as the real drawing, but a little bit different)
! y: J( m5 g6 x- QWe can see it is not easy to install the 22 meters heat trace according as figure 1: h' \% B2 @1 q1 |5 V/ z
6 O, R$ Q H4 A5 x% {) A3 `# X
& U, d5 a7 w/ [
( u6 s8 F$ V5 ~: x' q9 K7 E, e( e
6 g. X" b- K& F0 xAs a normal question we just discuss:3 e4 ?" K1 k$ k" C' l2 s2 n' e
How do you run these 9.4 meters heat trace (size 5/16 inch) on the 3 inches 1.4 meters pipe ?
2 O, x/ ]' i! Y+ l9 y' M; v* _( [2 sI call this is JACK LAI Spiral Method 螺旋法
( L, s; R/ H( H4 T! B; G' dThe outside circumference of the 3 inch pipe is more than 10 inches. See figure 2.
; j+ Y$ S/ B, \, {There are 10 positions to plac the heat trace. They are 0.1,2,3,,,,,9. The distance between each position--heat trace is about one inch. / ], z7 v8 [! m5 z+ C) I
Because the pipe is horizontal, position 0 can not be placed. See figure 2
1 y' D/ W7 o; k& M2 N( O, sBecause the maximum bend radius of the heat trace is 2 inches( see note 1), position 5 can not be placed. See figure 2. Then the route of the heat trace can be like figure 3, I) c5 F8 h' b/ D) ^ M, _6 W
The total heat trace that can be installed here is about ) j& c$ J. J3 d6 \, h" U- b
1.4 * 6 + 1 * 2 = 8.6 + 2 =10.8 Meters9 K3 y1 H) p+ ?% T; a! O
So, the 9.4 meters heat trace can be installed along the 3 inched 1.4 meters pipe without a problem. % ^6 x3 j: A' |, B; d' E! P
$ g" m" \$ V. p+ Q! o1 b
Note :( K, d9 q; u! B
1. The minimum bend radius:/ \2 Y/ T, D. k* R: t. \9 v
Because the heat trace size here is 5/16, 6 times the outside diameter of the heat trace is
+ s1 j; t+ R1 I2 T% F( b. B4 z5/16 *6 = 30/16 almost = 2 inches
2 X( A+ j: x9 e3 eSo the maximum bend radius is 2 inches.
, o/ O$ o: G: x9 |6 L) |. T. }* w$ s& C6 y
" K, g R. t4 _$ {, X" E
& k# y; C \7 r+ `& Y( x% x' v) }$ w
Summary
$ C( T! M+ n+ a; ~As regular ; b) N7 F1 C; ]6 H) r. L4 M v& Y
For 3 inch pip: If heat trace size is 5/16 inch, and no RTD, the box position is close to the end of pipe. 1 meter long pipe {3 V m9 a2 ~2 v' e* x& K D2 _
if the pipe is horizontal, The length of heat trace can be installed is about# |$ q2 w% \$ t' ?# H6 ^6 d
1 * 9 = 9 meters
" U: K# R2 H f/ i+ [5 BIf the pipe is vertical, The length of heat trace can be installed is about
, F. m) J+ D3 h; ^4 M# c1 * 10 = 10 meters. 0 ~5 d( p. |0 M+ q1 L
For 2 inch pipe: If heat trace size is 5/16 inch, and no RTD, the box position is close to the end of pipe. 1 meter long pipe6 k" ~5 p$ R! e8 C' p( Z
if the pipe is horizontal , The length of heat trace can be installed is about/ [8 z- D x7 r/ I5 Y
1 * 4 = 4 meters* k# d6 E" O, m/ S
If the pipe is vertical, The length of heat trace can be installed is about9 `! H. L% X$ A
1 * 5 = 5 meters. |
|