A 6.5 inch dia shaft is to be machined on a TURNING CTR to 4.5 inch dia in 4 equal cuts. If CONSTANT CS is selected calculate the RPM at the beginning of each cut.4 I* a- u1 l$ k0 s4 V& P# I
NOTE: CS=1000 ft/min for carbide insert used.8 ?" U5 N$ ?: J, S; ?# n1 e" D
1 w8 r% B1 a# v" ?. g" H
so RPM(1)= 0 i0 [; Q: N9 V B- V3 m RPM(2)= : a" ]+ {$ }4 c1 @ RPM(3)= ; j# ^4 o7 @7 R) V. I/ c v RPM(4)= 4 w, l/ x! u& Z' ?% s8 e0 z' W1 m+ g
谢谢指教。